26/12/2024
Recently, Shougang Tonggang making Division has received good news. With the joint efforts of all staff, the division has successfully rolled the low-alloy high-strength Q355B checkered plate for the first time.
28/08/2024
Shougang achieves a supply of corrosion-resistant and wear-resistant steel for high-end agricultural machinery.
05/07/2024
Jingtang MCCR Production Line Achieves 0.75mm Ultra-Thin Rolling
From June 20 to 21, the Shougang Jingtang Steel Rolling Department MCCR production line broke records in thin product production and continuous casting furnace number, setting a record of successful trial production of 0.75mm ultra-thin products and 29 furnaces of molten steel and 1006 minutes of uninterrupted continuous casting.
17/06/2024
Shougang Jingtang Medium and Thick Plates Supply Dubai Habtoor Project
Recently, Shougang Jingtang High-grade Steel Supply Dubai Habtoor Apartment Project.
14/06/2024
Recently, Shougang Jingtang Medium and Thick Plates - 160mm Extra Thick High-rise Steel Has Been Supplied in Bulk. It has broken the upper limit of the delivery standard of 150mm for this product level.
12/06/2024
SHOUGANG's Blast Furnace Dehumidification Project has Been fully Completed
Recently, Shougang Co., Ltd.'s No. 1 and No. 2 blast furnaces' dehumidification project was put into operation. This marks the full completion of Shougang's blast furnace dehumidification project.
05/06/2024
Shougang Jingtang supplies stainless steel composite steel plates for the Jingtang Intercity Railway Bridge project.
Timely Info | Independent | Platform | Multiple guarantees | Self-operated storage |
About us | Channel | Useful tools |
---|---|---|
About China Steel Market | Prices | Steel weight calculation |
Contact us | Answers | |
Terms & Conditions | Inventory | |
Privacy Policy | Help |
Hot search words: