The Jinan Phoenix Yellow River Bridge South Extension Project is an important component of Jinan's "Eight Horizontal and Eight Vertical" expressway network, and also Jinan's first elevated road project using a fully prefabricated assembly structure and its first fully enclosed sound barrier project. Recently, the installation of the first span of the steel box girder across the road was successfully completed, marking the start of the crucial stage of main construction. As a core steel supplier for the project, Shandong Steel has supplied nearly 10,000 tons of high-strength rebar (Prices), with large-diameter rebar (over 28 mm) accounting for more than 40%, further consolidating Shandong Steel's leading position in the provincial rebar (Introduction) market.
|
|
|
|
|
| Timely Info | Independent | Platform | Multiple guarantees | Self-operated storage |
| About us | Channel | Useful tools |
|---|---|---|
| About China Steel Market | Prices | Steel Weight Calculation |
| Contact Us | Answers | Why Choose Us |
| Terms & Conditions | Inventory | |
| Privacy Policy | Help |
Hot search words: