Parts pre-treatment, oil removal, and rust removal (can be processed offline) → water washing → flash plating to replace copper → water washing → mechanical galvanizing deposition transition bottom layer → mechanical galvanizing deposition → water polishing → parts pouring and separation → hot water washing (or press It is required that the surface of the parts is chromium passivated and dipped into the relevant protective layer) → dried and dried → tested and accepted.
Time:01/04/2024 12:24:29
Answer the question
Copyright Notice © 2022 - 2023 ChinaSteelMarket.com All rights reserved.